![海讯](http://img3.yun300.cn/img/ny220210224174451.jpg?tenantId=222359&viewType=1&k=1663666860000)
High-speed wheeled light-duty assault bridge erection vehicle
- Categories:Emergency rescue equipment
- Author:
- Origin:
- Time of issue:2021-03-18
- Views:0
(Summary description)The high-speed wheeled light-duty assault bridge erection vehicle is suitable for quickly reaching the designated location in the event of road damage, erecting bridges, ensuring that the vehicle overcomes obstacles such as small valleys, cliffs and other obstacles to ensure smooth passage of life. It is a project with strong comprehensive support capabilities. equipment.
High-speed wheeled light-duty assault bridge erection vehicle
(Summary description)The high-speed wheeled light-duty assault bridge erection vehicle is suitable for quickly reaching the designated location in the event of road damage, erecting bridges, ensuring that the vehicle overcomes obstacles such as small valleys, cliffs and other obstacles to ensure smooth passage of life. It is a project with strong comprehensive support capabilities. equipment.
- Categories:Emergency rescue equipment
- Author:
- Origin:
- Time of issue:2021-03-18
- Views:0
(1) Applicable situation
The high-speed wheeled light-duty assault bridge erection vehicle is suitable for quickly reaching the designated location in the event of road damage, erecting bridges, ensuring that the vehicle overcomes obstacles such as small valleys, cliffs and other obstacles to ensure smooth passage of life. It is a project with strong comprehensive support capabilities. equipment.
(2) Product Highlights
Strong maneuverability, the maximum speed of the equipment is ≥100km/h, and it can quickly reach the designated site to erect emergency temporary bridges to ensure the emergency traffic of disaster relief vehicles
With strong attack capability, this equipment is specially designed for the emergency situation of road damage and pavement collapse under earthquake geological disasters. It can quickly solve temporary bridge problems, overcome obstacles such as small valleys, cliffs and other obstacles to ensure that rescue teams quickly reach the disaster relief site and carry out dangerous work.
(3) Technical Parameters
Serial number | Project | Parameter | Remarks |
1 | Curb quality |
≥13t |
|
2 | Maximum travel speed |
≥100km/h |
|
3 | Bridge length | ≥13m | |
4 | Bridge width | ≥2.4m | |
5 | Bridge carrying capacity |
≥10t |
Scan the QR code to read on your phone
![hisoon hisoon](http://img3.yun300.cn/img/ew1.png?tenantId=222359&viewType=1&k=1663666860000)
Follow WeChat public account
More exciting waiting for you!
Tel:+86-731-85180718
E-mail:info@hi-soon.com
Add:No. 60396068 Hunan Export Product
Cluster Area, Gaoqiao Grand Market, Yuhua
District, Changsha, Hunan, China